​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​ ​ Department of Natural Resources Water Permit Application
​​



Application Files

Stage: Review
File NameFile SizeCreatedModifiedFile Link
1 01-22-2024_Enbridge Response to USACE_Mellen South Alternative Analysis.pdf831K2/7/20242/7/2024Download Item
2 01-23-2023_2_Data Request Responses.pdf1,287K2/8/20232/8/2023Download Item
3 01-23-2023_Attach 2_A_2_Deer Creek IR Mitigation and Contingency Plan.pdf1,820K2/8/20232/8/2023Download Item
4 01-23-2023_Attach 2-A_1_White River IR Mitigation and Contingency Plan.pdf4,080K2/8/20232/8/2023Download Item
5 01-23-2023_Attach 2-A_10_Bad River IR Mitigation and Contingency Plan.pdf1,910K2/8/20232/8/2023Download Item
6 01-23-2023_Attach 2-A_11_Tyler Forks IR Mitigation and Contingency Plan.pdf2,119K2/8/20232/8/2023Download Item
7 01-23-2023_Attach 2-A_12_Potato River IR Mitigation and Contingency Plan.pdf4,593K2/8/20232/8/2023Download Item
8 01-23-2023_Attach 2-A_13_Vaughn Creek IR Mitigation and Contingency Plan.pdf1,877K2/8/20232/8/2023Download Item
9 01-23-2023_Attach 2-A_3_Marengo River IR Mitigation and Contingency Plan.pdf2,343K2/8/20232/8/2023Download Item
10 01-23-2023_Attach 2-A_4_Brunsweiler River IR Mitigation and Contingency Plan.pdf1,711K2/8/20232/8/2023Download Item
11 01-23-2023_Attach 2-A_5_Highway 13 IR Mitigation and Contingency Plan.pdf1,513K2/8/20232/8/2023Download Item
12 01-23-2023_Attach 2-A_6_Trout Brook IR Mitigation and Contingency Plan.pdf1,723K2/8/20232/8/2023Download Item
13 01-23-2023_Attach 2-A_7_Billy Creek IR Mitigation and Contingency Plan.pdf2,297K2/8/20232/8/2023Download Item
14 01-23-2023_Attach 2-A_8_Silver Creek IR Mitigation and Contingency Plan.pdf1,383K2/8/20232/8/2023Download Item
15 01-23-2023_Attach 2-A_9_Krause Creek IR Mitigation and Contingency Plan.pdf1,959K2/8/20232/8/2023Download Item
16 01-23-2023_Attachment 11-A.pdf104,356K2/8/20232/8/2023Download Item
17 01-23-2023_Attachment 11-A_reduced.pdf37,171K2/8/20232/8/2023Download Item
18 01-23-2023_Attachment 12-A.pdf515K2/8/20232/8/2023Download Item
19 01-23-2023_Attachment 12-B.pdf679K2/8/20232/8/2023Download Item
20 01-23-2023_Attachment 8-A.pdf650K2/8/20232/8/2023Download Item
21 01-23-2023_Attachment 8-B.pdf1,046K2/8/20232/8/2023Download Item
22 01-23-2023_Attachment 8-C.pdf2,937K2/8/20232/8/2023Download Item
23 01-23-2023_Attachment 9-A.pdf9,044K2/8/20232/8/2023Download Item
24 01-23-2023_Cover Letter_USACE IR Responses.pdf113K11/1/202311/1/2023Download Item
25 01-25-2024 EPA Comments to Enbridge_Water Quality Monitoring Plan V3.pdf861K2/7/20242/7/2024Download Item
26 01-29-2024_DNR Information Request_Water Quality, Wetlands, Waterways.pdf260K1/31/20241/31/2024Download Item
27 02-01-2024 Enbridge Supplemental Response to Question 20, EPA Cumulative Impact.pdf237K2/20/20242/20/2024Download Item
28 02-02-2024 Revised Wetland Mitigation Table.pdf94K2/2/20242/2/2024Download Item
29 02-05-2024 Enbridge Response to USACE_High Quality Wetland Impact Avoidance.pdf3,143K2/6/20242/6/2024Download Item
30 02-06-2024 Enbridge Response to EPA Comments on Seed Mix.pdf216K2/6/20242/6/2024Download Item
31 02-09-2024_Revised EPP.pdf9,804K2/20/20242/20/2024Download Item
32 02-13-2023_1_Line_5_Wisconsin_Relocate_ExecSummary_20230213.pdf168K2/16/20232/16/2023Download Item
33 02-13-2023_2_Line_5_Wisconsin_Relocate_OilSpill Report_20230213.pdf7,863K2/16/20232/16/2023Download Item
34 02-13-2023_3_Line_5_Wisconsin_Relocate_AppxA_Probability Assessment_20230203.pdf370K2/16/20232/16/2023Download Item
35 02-13-2023_4_Line_5_Wisconsin_Relocate_AppxB_SIMAP_20230213.pdf18,935K2/16/20232/16/2023Download Item
36 02-13-2023_5_Line_5_Wisconsin_Relocate_AppxC_OILMAPLand_20230213.pdf23,037K2/16/20232/16/2023Download Item
37 02-13-2023_6_Line_5_Wisconsin_Relocate_Sediment_Report_20230213.pdf16,673K2/16/20232/16/2023Download Item
38 02-15-2024_Enbridge Response_Route Variants Analysis.pdf796K4/17/20244/17/2024Download Item
39 03-02-2021 Enbridge Response to DNR EIS IR.pdf6,180K2/2/20242/2/2024Download Item
40 03-02-2024 Updated Invasive Species Plan_20240229.pdf58,960K4/17/20244/17/2024Download Item
41 03-02-2024 Updated QAPP (WQMP V4).pdf62,896K4/17/20244/17/2024Download Item
42 03-02-2024 Updated Wetland Waterbody Crossing Table_20240228.xls1,064K4/17/20244/17/2024Download Item
43 03-02-2024 Updated WQ Monitoring Plan, Verison 4.pdf55,142K4/17/20244/17/2024Download Item
44 03-06-2023_Enbridge.Response.to.EPA.pdf536K3/6/20233/6/2023Download Item
45 03-10-2023.Enbridge.L5R.DNR.informational.request.pdf397K3/10/20233/10/2023Download Item
46 03-15-2024 Updated Postconstruction Monitoring Plan, Version 3.pdf1,041K4/17/20244/17/2024Download Item
47 03-21-2024 Attachment 7_Site Specific Channel Remediation_IFC_Revised.pdf21,798K4/17/20244/17/2024Download Item
48 03-21-2024 DNR Data Request Response_Wetlands Waterways.pdf22,818K4/17/20244/17/2024Download Item
49 04-08-2024 Updated WQMP, Version 4.1.pdf179,402K4/17/20244/17/2024Download Item
50 04-08-2024_HQ Wetland Impact Avoidance_Updated.pdf4,797K4/18/20244/18/2024Download Item
51 04-09-2024 EPP_with Appendices_Revised.pdf5,923K4/18/20244/18/2024Download Item
52 04-11-2024 DNR Data Request Responses_Wetlands.pdf90K4/18/20244/18/2024Download Item
53 04-11-2024 Potential Sheet Piling Areas.pdf359K4/18/20244/18/2024Download Item
55 04-11-2024 Wetland and Waterbody Photos_Existing Line 5 Corridor_Redacted.pdf8,605K4/18/20244/18/2024Download Item
57 04-11-2024 Wetland Timed Meander Survey Report Addendum_Redacted.pdf103,206K4/18/20244/18/2024Download Item
58 05-07-2024 EPA Comments on Post-Construction Monitoring Plan810K7/17/20247/17/2024Download Item
59 05-10-2021_L5WSRP Stream Activity Waiver Request_20210510.pdf339K10/5/202110/5/2021Download Item
60 05-10-2021_Supp_Attach F_Wetland Waterbody Crossing Table_20210506.xls706K10/5/202110/5/2021Download Item
61 05-10-2021_Timing Restriction Waiver Request Form.pdf477K10/5/202110/5/2021Download Item
62 05-14-2021_L5WSRP CN Railroad Casing_20210514.pdf716K10/5/202110/5/2021Download Item
63 06-01-2021_L5WSRP Cover letter_20210601.pdf333K10/5/202110/5/2021Download Item
64 06-01-2021_Line 5 Hydrostatic Test Plan_June_1_2021.pdf2,064K10/5/202110/5/2021Download Item
65 06-11-2021_Cover Letter_20210611.pdf265K10/5/202110/5/2021Download Item
66 06-11-2021_L5WSRP CN Railroad Casing_20210611.pdf669K10/5/202110/5/2021Download Item
67 06-11-2021_L5WSRP Information Response to WDNR-20210611.pdf232K10/5/202110/5/2021Download Item
68 06-11-2021_Supp_Attach A_Updated Topo pages.pdf2,988K10/5/202110/5/2021Download Item
69 06-11-2021_Supp_Attach B_Updated Aerial pages.pdf4,703K10/5/202110/5/2021Download Item
70 06-11-2021_Supp_Attach F_Wetland Waterbody Crossing Table_20210611.xls708K10/5/202110/5/2021Download Item
71 06-11-2021_Supp_Attach G_Updated SSURGO pages.pdf5,763K10/5/202110/5/2021Download Item
72 06-11-2021_Updated EIR Table 2.1.3-1_Proposed Project Schedule.pdf242K10/5/202110/5/2021Download Item
73 06-11-2021_Updated EIR Table 4.2.3-1_Proposed Access Roads.docx59K10/5/202110/5/2021Download Item
74 06-11-2021_Updated EIR Table 5.4.2-1_Wetland Classification by Watershed.docx89K10/5/202110/5/2021Download Item
75 06-11-2021_Updated EIR Table 6.2.1-1_Acres Soil Characteristics.docx90K10/5/202110/5/2021Download Item
76 06-11-2021_Updated EIR Table 6.2.1-2_Topsoil Depths.docx88K10/5/202110/5/2021Download Item
77 06-11-2021_Updated EIR Table 6.4.2-1_Wetland Impact Summary.docx86K10/5/202110/5/2021Download Item
78 06-11-2021_Updated EIR Table 6.6-1_Land Use Types.docx90K10/5/202110/5/2021Download Item
79 06-11-2021_Updated Supp Table 3.1.5-1_Mainline Valves.docx62K10/5/202110/5/2021Download Item
80 06-11-2021_Updated Supp Table 5.2-1_Wetland Impact Summary.docx62K10/5/202110/5/2021Download Item
81 06-18-2021_L5WSRP DNR Information Response_20210618.pdf955K10/5/202110/5/2021Download Item
82 07-03-2024 Enbridge Response to DNR IR_WQ Monitoring Plan.pdf211K9/5/20249/5/2024Download Item
83 07-03-2024 Information Request and Response_Rock Creek and TCSB locations.pdf751K7/17/20247/17/2024Download Item
84 07-03-2024 Information Request and Response_Waterways and Bank Stabilization.pdf101,054K7/17/20247/17/2024Download Item
85 07-03-2024 IR Request and Response_Dynamite Blasting in Wetlands with Bedrock.pdf155K7/17/20247/17/2024Download Item
86 07-03-2024 Project Map with TCSB Locations.pdf82,375K7/17/20247/17/2024Download Item
87 07-03-2024 Updated WQMP, Version 4.2.pdf130,009K7/17/20247/17/2024Download Item
88 07-03-2024 Wetland Time Meader Survey_Responses.pdf195K7/17/20247/17/2024Download Item
89 07102023_Wetland Waterbody Crossing Table.xls824K9/20/20239/20/2023Download Item
90 07-19-2024 INS Plan_Version 1.1.pdf108,768K9/5/20249/5/2024Download Item
91 07-25-2024 Information Request and Response_Beaver Dams.pdf7,580K9/5/20249/5/2024Download Item
92 08-02-2024 Wetland and Waterbody Restoration and Post-Construction Monitoring Plan_V3.1.pdf927K9/5/20249/5/2024Download Item
93 08-09-2023_DRAFT_Water Quality Monitoring Plan.pdf55,236K8/10/20238/10/2023Download Item
94 08-16-2024 Wetland and Waterway Post-Construction Monitoring Plan_V3.2.pdf887K9/5/20249/5/2024Download Item
96 08-19-2021_EPP_Line 5_20210803_updated 20210801.pdf1,983K10/5/202110/5/2021Download Item
97 08-19-2021_L5WSRP Information Response to WDNR_20210819.pdf345K10/5/202110/5/2021Download Item
98 08-19-2021_Line 5 Hydrostatic Test Plan_updated 20210801.pdf2,530K10/5/202110/5/2021Download Item
99 08-21-2023 DNR Response Regarding 2023 WQ Sampling.pdf452K9/20/20239/20/2023Download Item
100 08-30-2024 Wetland and Waterway Post-Construction Monitoring Plan_V3.3.pdf850K9/5/20249/5/2024Download Item
101 09-08-2022_DRAFT_Water Quality Monitoring Plan_20220906.pdf16,479K9/30/20229/30/2022Download Item
102 09-16-2021_Attachment A_Proposed Project Schedule.pdf242K10/5/202110/5/2021Download Item
103 09-16-2021_Attachment B_Stream Crossing Comparison Table.pdf653K10/5/202110/5/2021Download Item
104 09-16-2021_Attachment C_Wetland Waterbody Crossing Table_20210915_updated.xls700K10/5/202110/5/2021Download Item
105 09-16-2021_Attachment D_Pages from DNRs Prohibited Invasives.pdf434K10/5/202110/5/2021Download Item
106 09-16-2021_Attachment E_EPP_Line 5_20210916_updated.pdf2,592K10/5/202110/5/2021Download Item
107 09-16-2021_EPP_Line 5_20210916_clean.docx210K10/5/202110/5/2021Download Item
108 09-16-2021_L5WSRP Information Response to WDNR-20210916.docx123K10/5/202110/5/2021Download Item
109 09-16-2021_Sept 2021 Enbridge Line 5 Data Request Questions_20210916.docx2,269K10/5/202110/5/2021Download Item
110 09-17-2024 Enbridge Request for 401 WQC.pdf116K10/7/202410/7/2024Download Item
111 09-25-24 DNR Response to WQC Request, USACE Reasonable Period of Time.pdf549K10/7/202410/7/2024Download Item
112 10 - 31 - 2022 -IP-NO-2020-2-N00471.(enbridge.L5R.IR.10.31.22).ltr.pdf161K11/1/202211/1/2022Download Item
114 10-05-2023 MNRD Line 5 Reroute.Addendum with Field Data_July2023_Redacted.pdf5,000K4/17/20244/17/2024Download Item
115 10-09-2021_L5WSRP Navigability_20210927.pdf2,734K10/9/202110/9/2021Download Item
116 10-12-2023 EPA Comments to Enbridge, WQ Monitoring Plan.pdf225K10/25/202310/25/2023Download Item
117 10-13-23_DNR Information Request_Water Quality, Wetlands, Waterways.pdf899K10/18/202310/18/2023Download Item
118 10-17-2023 Enbridge Response to EPA, Sediment Modeling.pdf369K10/25/202310/25/2023Download Item
119 10-18-2023 GIS Data.zip7,995K10/26/202310/26/2023Download Item
120 10-20-2023 DNR Information Request_Spill and Sediment Modeling.pdf427K10/25/202310/25/2023Download Item
121 10-4-2021_L5WSRP Information Response to WDNR-20211004.pdf1,049K10/5/202110/5/2021Download Item
122 11-06-2024 Enbridge Submittal.pdf1,090K11/19/202411/19/2024Download Item
124 11-15-2023 MNRD 2022 Wetland Field Data Report_Redacted.pdf7,400K4/17/20244/17/2024Download Item
125 11-18-2022_EnbridgeLine5_WQ_MonitoringPlan_EPA_Comments_CvrLetter.pdf244K11/21/202211/21/2022Download Item
126 11-18-2022_EPA comments Enbridge Line5 reroute Monitoring Plan 2022-11-14.pdf227K11/21/202211/21/2022Download Item
127 11-22-2023 Enbridge Response to DNR_Cover Letter_Water Quality, Wetlands, Waterways.pdf111K12/11/202312/11/2023Download Item
128 11-22-2023 Enbridge Response to DNR_Water Quality, Wetlands, Waterways.pdf945K12/11/202312/11/2023Download Item
129 11-22-2023_Enbridge Response_Attachment 1_Water Quality Monitoring Plan.pdf55,229K12/11/202312/11/2023Download Item
130 11-22-2023_Enbridge Response_Attachment 10_Permanent Bank Structures Site Photos.pdf4,096K12/11/202312/11/2023Download Item
131 11-22-2023_Enbridge Response_Attachment 11_Typical wetland non cohesive.pdf173K12/11/202312/11/2023Download Item
132 11-22-2023_Enbridge Response_Attachment 12_Wetland Waterbody Crossing Table.xls902K12/11/202312/11/2023Download Item
133 11-22-2023_Enbridge Response_Attachment 13_Bridge Typicals.pdf509K12/11/202312/11/2023Download Item
134 11-22-2023_Enbridge Response_Attachment 2_QAPP.pdf21,410K12/11/202312/11/2023Download Item
135 11-22-2023_Enbridge Response_Attachment 3_Sampling Parameters.pdf321K12/11/202312/11/2023Download Item
136 11-22-2023_Enbridge Response_Attachment 4_Bank Stability Decision Tree.pdf73K12/11/202312/11/2023Download Item
137 11-22-2023_Enbridge Response_Attachment 5_Equipment Wash Station.pdf131K12/11/202312/11/2023Download Item
138 11-22-2023_Enbridge Response_Attachment 6_Field Emergency Response Plan.pdf5,891K12/11/202312/11/2023Download Item
139 11-22-2023_Enbridge Response_Attachment 7_Site Specific Channel Remediation_IFC.pdf25,210K12/11/202312/11/2023Download Item
140 11-22-2023_Enbridge Response_Attachment 8_Waterbody Data Sheets.pdf6,672K12/11/202312/11/2023Download Item
141 11-22-2023_Enbridge Response_Attachment 9_Pipeline Minimization Design.pdf163K12/11/202312/11/2023Download Item
142 11-30-2022_IR1_HCA_USA_RestrictedPolygons.xlsx31K12/16/202212/16/2022Download Item
143 11-30-2022_L5_AOIs_2022Nov10.gdb.zip9,885K12/16/202212/16/2022Download Item
144 11-30-2022_L5R_WDNRnov2022_IR1.zip1,876K12/16/202212/16/2022Download Item
145 11-30-2022_L5WSRP Data Request Responses_20221130.pdf749K12/16/202212/16/2022Download Item
146 12-09-2022_2020-00260-WMS 20221209 RAI.pdf347K12/16/202212/16/2022Download Item
147 12-09-2022_USACE.information.request.2020-00260-WMS.20221209.RAI.pdf347K12/13/202212/13/2022Download Item
148 12-11-2020 Enbridge Response to DNR EIS IR.pdf4,388K2/2/20242/2/2024Download Item
149 12-14-2023 EPA Comments to Enbridge on EPP Seed Mix.pdf290K1/4/20241/4/2024Download Item
150 12-14-2023 EPA Comments to Enbridge on Macroinvertebrate Sampling.pdf339K1/4/20241/4/2024Download Item
151 12-16-2021-Project.Maps.(dEIS.Appendix.H).(Application.Appendix.B)_Updated_2021.12.13.pdf17,504K12/16/202112/16/2021Download Item
152 2023 Bald Eagle Nest Survey Report_N00471.pdf15,213K11/14/202311/14/2023Download Item
153 2023 WQ Monitoring Report_Appendix H.pdf79,973K4/17/20244/17/2024Download Item
154 2023 WQ Monitoring Report_excludes Appendix H.pdf110,638K2/21/20242/21/2024Download Item
156 20241113 FIN 73858 EL5 Relocation Ashland Bayfield Iron Co_N00471.pdf229K11/14/202411/14/2024Download Item
157 6-15-2023_10_06052023 Data Response_Attachment 6.xlsx31,146K7/18/20237/18/2023Download Item
158 6-15-2023_11_06052023 Data Response_Attachment 7.pdf2,396K7/18/20237/18/2023Download Item
159 6-15-2023_12_06052023 Data Response_Attachment 8.pdf183K7/18/20237/18/2023Download Item
160 6-15-2023_13_06052023 Data Response_Attachment 9.pdf107,828K7/18/20237/18/2023Download Item
161 6-15-2023_14_06052023 Data Response_Attachment 10.pdf470K7/18/20237/18/2023Download Item
162 6-15-2023_15_06052023 Data Response_Attachment 11.pdf825K7/18/20237/18/2023Download Item
163 6-15-2023_16_06052023 Data Response_Attachment 12.pdf16,904K7/18/20237/18/2023Download Item
164 6-15-2023_17_06052023 Data Response Attachment 13 Cover sheet.pdf30K7/18/20237/18/2023Download Item
165 6-15-2023_18_06052023 Data Response_Attachment 13.xlsx47K7/18/20237/18/2023Download Item
166 6-15-2023_2_06052023_Data Response_Final.pdf649K7/18/20237/18/2023Download Item
167 6-15-2023_3_06052023 Data Response_Attachment 1 Cover sheet.pdf182K7/18/20237/18/2023Download Item
168 6-15-2023_4_06052023 Data Response_Attachment 1.xls820K7/18/20237/18/2023Download Item
169 6-15-2023_5_06052023 Data Response_Attachment 2.pdf77,487K7/18/20237/18/2023Download Item
170 6-15-2023_6_06052023 Data Response_Attachment 3.pdf6,016K7/18/20237/18/2023Download Item
171 6-15-2023_7_06052023 Data Response_Attachment 4.pdf860K7/18/20237/18/2023Download Item
172 6-15-2023_8_06052023 Data Response_Attachment 5.pdf1,243K7/18/20237/18/2023Download Item
173 6-15-2023_9_06052023 Data Response Attachment 6 Cover sheet.pdf30K7/18/20237/18/2023Download Item
174 6-15-203_1_06052023 Data Response_Cover Letter.pdf121K7/18/20237/18/2023Download Item
175 8-28-2020 Application Attachment A (Topo Map) updated submittal.pdf6,712K9/10/20209/17/2020Download Item
176 8-28-2020 Application Attachment B (Aerial Map, wetlands and waterways map) updated submittal.pdf13,796K9/10/20209/17/2020Download Item
177 8-28-2020 Application Attachment D and F (Wetland and Waterbody Crossing Table) updated submittal.xls722K9/10/20209/10/2020Download Item
178 8-28-2020 Application Attachment D and F (Wetland and Waterbody Crossing Table) updated submittal.xlsx275K8/7/20218/7/2021Download Item
179 8-28-2020 Application Attachment G (Soils Map) updated submittal.pdf8,869K9/10/20209/17/2020Download Item
181 8-28-2020 Application Attachment K (Landowner List) updated submittal.pdf1,028K9/10/20209/17/2020Download Item
182 8-28-2020 Application Attachment L (Route Adjustments Map).pdf658K9/10/20209/17/2020Download Item
184 8-28-2020 EIR (Clean and Public version) updated submittal.pdf28,530K9/10/20209/17/2020Download Item
185 8-28-2020 EIR (Track Change and Public version) updated submittal.pdf28,586K9/10/20209/17/2020Download Item
186 8-28-2020 GIS Data.zip6,926K9/27/20239/27/2023Download Item
187 8-28-2020 Narrative (clean version) updated submittal.pdf464K9/10/20209/17/2020Download Item
188 8-28-2020 Narrative (track changes version) updated submittal.pdf483K9/10/20209/17/2020Download Item
189 AttachB_Aerial_full set_revised 4-1-20.pdf33,741K4/20/20204/20/2020Download Item
190 AttachB_Aerial_MapsSet1of3_N00471.pdf12,539K2/12/20202/12/2020Download Item
191 AttachB_Aerial_MapsSet2of3_N00471.pdf13,387K2/12/20202/12/2020Download Item
192 AttachB_Aerial_MapsSet3of3_N00471.pdf13,342K2/12/20202/12/2020Download Item
193 AttachD_WaterbodyCrossingTable_N00471.pdf155K2/12/20202/12/2020Download Item
194 AttachD_WaterbodyCrossingTable_revised 4-1-20.pdf107K4/20/20204/20/2020Download Item
195 AttachE_WetlandDelineationReportConcurrenceCommunication.pdf117K3/3/20203/3/2020Download Item
196 AttachF_WetlandCrossingTable_N00471.pdf216K2/12/20202/12/2020Download Item
197 AttachF_WetlandCrossingTable_revised 4-1-20.pdf123K4/20/20204/20/2020Download Item
198 AttachG_SSURGO_MapsSet1of2_N00471.pdf12,009K2/12/20202/12/2020Download Item
199 AttachG_SSURGO_MapsSet2of2_N00471.pdf10,327K2/12/20202/12/2020Download Item
205 Attachment C_Supp Attach A Topographic Maps_20230630.pdf11,444K9/20/20239/20/2023Download Item
206 Attachment C_Supp Attach B Aerial Maps 20230630.pdf34,111K9/20/20239/20/2023Download Item
207 Attachment C_Supp Attach G_SSURGO Maps_20230630.pdf16,911K9/20/20239/20/2023Download Item
208 Attachment D_ESCP B Sheets_20230630.pdf72,570K9/20/20239/20/2023Download Item
209 Attachment D_ESCP C Sheets__20230630.pdf22,363K9/20/20239/20/2023Download Item
210 Attachment D_ESCP D Sheets_20230630.pdf16,309K9/20/20239/20/2023Download Item
211 Combined Public Notice (NPA and EIS Scoping Hearing) 6-8-20.pdf111K6/8/20206/8/2020Download Item
212 Delineation Maps_AttachC_Wetland Report_Full map set (Appendix I).pdf55,836K2/14/20202/14/2020Download Item
214 Delineation Report Text.pdf3,244K2/14/20202/14/2020Download Item
215 DelineationReport_Appendix A _Qualifications.pdf1,116K3/25/20203/25/2020Download Item
216 DelineationReport_Appendix B_Soils table.pdf211K3/25/20203/25/2020Download Item
217 DelineationReport_Appendix C_wetland summary table.pdf207K3/25/20203/25/2020Download Item
218 DelineationReport_Appendix D_wetland data sheets and photos_part 1 of 22.pdf43,256K3/25/20203/25/2020Download Item
219 DelineationReport_Appendix D_wetland data sheets and photos_part 10 of 22.pdf47,340K3/25/20203/25/2020Download Item
220 DelineationReport_Appendix D_wetland data sheets and photos_part 11 of 22.pdf43,584K3/25/20203/25/2020Download Item
221 DelineationReport_Appendix D_wetland data sheets and photos_part 12 of 22.pdf44,290K3/25/20203/25/2020Download Item
222 DelineationReport_Appendix D_wetland data sheets and photos_part 13 of 22.pdf44,195K3/25/20203/25/2020Download Item
223 DelineationReport_Appendix D_wetland data sheets and photos_part 14 of 22.pdf34,295K3/25/20203/25/2020Download Item
224 DelineationReport_Appendix D_wetland data sheets and photos_part 15 of 22.pdf45,593K3/25/20203/25/2020Download Item
225 DelineationReport_Appendix D_wetland data sheets and photos_part 16 of 22.pdf41,844K3/25/20203/25/2020Download Item
226 DelineationReport_Appendix D_wetland data sheets and photos_part 17 of 22.pdf42,770K3/25/20203/25/2020Download Item
227 DelineationReport_Appendix D_wetland data sheets and photos_part 18 of 22.pdf46,161K3/25/20203/25/2020Download Item
228 DelineationReport_Appendix D_wetland data sheets and photos_part 19 of 22.pdf41,920K3/25/20203/25/2020Download Item
229 DelineationReport_Appendix D_wetland data sheets and photos_part 2 of 22.pdf45,177K3/25/20203/25/2020Download Item
230 DelineationReport_Appendix D_wetland data sheets and photos_part 20 of 22.pdf43,650K3/25/20203/25/2020Download Item
231 DelineationReport_Appendix D_wetland data sheets and photos_part 21 of 22.pdf46,222K3/25/20203/25/2020Download Item
232 DelineationReport_Appendix D_wetland data sheets and photos_part 22 of 22.pdf10,611K3/25/20203/25/2020Download Item
233 DelineationReport_Appendix D_wetland data sheets and photos_part 3 of 22.pdf44,625K3/25/20203/25/2020Download Item
234 DelineationReport_Appendix D_wetland data sheets and photos_part 4 of 22.pdf38,041K3/25/20203/25/2020Download Item
235 DelineationReport_Appendix D_wetland data sheets and photos_part 5 of 22.pdf42,952K3/25/20203/25/2020Download Item
236 DelineationReport_Appendix D_wetland data sheets and photos_part 6 of 22.pdf44,069K3/25/20203/25/2020Download Item
237 DelineationReport_Appendix D_wetland data sheets and photos_part 7 of 22.pdf47,002K3/25/20203/25/2020Download Item
238 DelineationReport_Appendix D_wetland data sheets and photos_part 8 of 22.pdf38,995K3/25/20203/25/2020Download Item
239 DelineationReport_Appendix D_wetland data sheets and photos_part 9 of 22.pdf37,352K3/25/20203/25/2020Download Item
240 DelineationReport_Appendix E_Waterbody Summary Table.pdf158K3/25/20203/25/2020Download Item
241 DelineationReport_Appendix F_Waterbody Forms and Photos_part 1 of 4.pdf55,408K3/25/20203/25/2020Download Item
242 DelineationReport_Appendix F_Waterbody Forms and Photos_part 2 of 4.pdf39,302K3/25/20203/25/2020Download Item
243 DelineationReport_Appendix F_Waterbody Forms and Photos_part 3 of 4.pdf55,995K3/25/20203/25/2020Download Item
244 DelineationReport_Appendix F_Waterbody Forms and Photos_part 4 of 4.pdf51,270K3/25/20203/25/2020Download Item
245 DelineationReport_Appendix G_Non-water points Summary Table.pdf62K3/25/20203/25/2020Download Item
246 DelineationReport_Appendix H_No Water Points Forms and Photos_part 1 of 2.pdf22,597K3/25/20203/25/2020Download Item
247 DelineationReport_Appendix H_No Water Points Forms and Photos_part 2 of 2.pdf40,975K3/25/20203/25/2020Download Item
248 Dynamite Blasting Plan_Updated April 2024.pdf1,122K6/17/20246/17/2024Download Item
249 ECP_October 2024_Attachment C Wetland Waterbody Crossing Table.xls517K11/25/202411/25/2024Download Item
250 EIR Table 4.2.3-1_Proposed Access Roads_Revised 20230629.pdf104K9/20/20239/20/2023Download Item
251 Enbridge L5 Relocation - DNR Additional Information Request_3-6-20 .pdf112K3/30/20203/30/2020Download Item
252 Enbridge narrative responses to DNR request for additional information_4-1-2020.pdf954K4/20/20204/20/2020Download Item
253 Enbridge response to DNR request for additional information_3-23-2021.pdf581K5/12/20215/12/2021Download Item
254 Enbridge response to DNR request for additional information_4-1-2021_Q18 Data Response_Text and Table 3.1.4-1_REVISED.pdf142K5/12/20215/12/2021Download Item
256 Enbridge response to DNR request for additional information_5-4-20.pdf288K7/11/20207/11/2020Download Item
258 Env. Impact Report (EIR)_revised 4-1-20.pdf78,661K4/20/20204/20/2020Download Item
260 Environmental Construction Plan_October 2024_Public_Attachment E.pdf612,546K10/30/202410/30/2024Download Item
261 Environmental Construction Plan_October 2024_Public_Excludes Attachment E.pdf243,299K10/30/202410/30/2024Download Item
262 FINAL Enbridge.L5R.ch.30.ch.281.permit.decision_N00471.pdf630K11/14/202411/14/2024Download Item
263 FINAL Enbridge.L5R.WQC.public.notice_N00471.pdf225K11/14/202411/14/2024Download Item
264 Final Enbridge.L5R.WQC_N00471.pdf638K11/14/202411/14/2024Download Item
265 GIS data 2019.zip1,202K9/27/20239/27/2023Download Item
266 July 2023 Project Updates_20230711.pdf263K9/20/20239/20/2023Download Item
267 L5WSRP Project Updates Cover Letter_20230711.pdf109K9/20/20239/20/2023Download Item
268 Line5_Wisconsin_Mussel Survey Report_Final.pdf20,134K2/2/20242/2/2024Download Item
269 Narrative_N00471.pdf1,746K2/12/20202/12/2020Download Item
270 Narrative_revised 4-1-20.pdf1,757K4/20/20204/20/2020Download Item
272 Ownership_N00471.pdf175K2/12/20202/12/2020Download Item
273 Permit Table 1_IP-NO-2020-2-N00471.pdf1,071K11/14/202411/14/2024Download Item
275 Proof of WQC Newspaper Publication_N00471.pdf6,633K12/4/202412/4/2024Download Item
276 Riparian Owners_N00471.pdf783K2/12/20202/12/2020Download Item
277 Site Map_N00471.pdf9,401K2/12/20202/12/2020Download Item
278 Site Photos_Note_N00471.pdf168K2/12/20202/12/2020Download Item
279 spcommon.png19K9/5/20249/5/2024Download Item
281 SUP Table 3.1.3-1_Proposed Access Roads_Revised 20230629.pdf104K9/20/20239/20/2023Download Item
282 Supp Table 3.1.5-1_Mainline Valves_updated 20230629.pdf29K9/20/20239/20/2023Download Item
283 SWPPP Attachment E_Access Road Table_Updated 20230629.pdf321K9/20/20239/20/2023Download Item
284 SWPPP_Attach H_Wetland Waterbody Crossing Table.xls824K9/20/20239/20/2023Download Item
285 Topo Maps_AttachA_full set_revised 4-1-20.pdf9,187K4/20/20204/20/2020Download Item
286 Topo Maps_AttachA_TopoMaps2of4_N00471.pdf8,577K2/12/20202/12/2020Download Item
287 Topo Maps_AttachA_TopoMapsSet3of4_N00471.pdf10,040K2/12/20202/12/2020Download Item
288 Topo Maps_AttachA_TopoMapsSet4of4_N00471.pdf6,190K2/12/20202/12/2020Download Item
289 Wetland Delineation Report (2019)_Combined.pdf1,272,711K1/29/20241/29/2024Download Item
290 Wetland Delineation Report Supplement (2020)_Combined.pdf768,533K1/29/20241/29/2024Download Item
292 Wetland Timed Meander Surveys Report_Redacted_N00471.pdf104,456K1/30/20241/30/2024Download Item
293 WRAPP_N00471.pdf303K2/12/20202/12/2020Download Item